It is one of the biggest concrete factories in Erbil
specifically and in Iraq as a whole. It was established
in year 2001 on a 30-acre (75,000 square meter)
land. It is capable to produce up to 220-ton of
concrete in one hour. It has 15 mixers, 4 concrete
pumps and 4 bulldozers. The raw materials are being
provided by contracts with cement and other material
factories supplied daily by 20 tipper trucks owned by
Barz Ready Mix.